EV-01 · Evidence
Evidence fit and sufficiency
Evidence quality depends on whether the method can answer the claim and whether the decision needs more certainty.
This lesson builds on PF-01 Decision before method, PF-04 Right-sized framing.
the method that cannot see the claim
A PM sees P95 response time rise for large workspaces. She opens the monitoring dashboard, adds a second week of data, breaks it out by region, and builds a chart. The chart is clean. The rise is real. She takes it to the roadmap review and asks for two engineers.
Someone asks whether users are actually being harmed. She goes back and adds more monitoring: p50, p99, time-to-first-render, a per-endpoint breakdown. Three days of good work. The answer to the question is still not in any of it.
Two different failures are hiding here, and they look alike from the inside.
The first is misfit. Monitoring measures system behaviour. The claim under debate is about user harm. No amount of additional monitoring converts one into the other, because the method was never able to observe the thing being claimed. More data of the wrong type feels like progress because the volume of evidence increases while the fit stays at zero.
The second is oversufficiency. If the decision is a two-week reversible reallocation of engineering time, it may already be answerable. Buying more certainty costs time, and time is the thing the decision was about. Teams routinely research past the point where the answer would change.
Both paths below start from the same claim. Only one of them runs through a method that can observe it, and no amount of travel down the other one arrives:
flowchart LR C["Claim in dispute<br/>are users harmed?"] --> M["Monitoring<br/>p50 · p99 · per-endpoint"] M -->|"more volume,<br/>same blind spot"| V["A cleaner chart<br/>of system behaviour"] V --> N["Claim still<br/>unobserved"] C -.->|"method that can<br/>observe harm"| O["Session review ·<br/>support records"] O --> A["A result that<br/>moves the decision"]
Ask, before starting any evidence work: which claim is this method able to observe, and what would I do differently if I had twice as much of it? If the method cannot observe the claim, stop. If twice as much changes nothing, stop.
fit and sufficiency are separate gates
Evidence work has two independent gates. A plan can pass one and fail the other.
Gate 1 — fit. Different claims are observable by different methods. The common failure is to pick a method you trust and aim it at a claim it cannot see.
| Claim type | What it asserts | Methods that can observe it | Methods that cannot |
|---|---|---|---|
| Existence | This behaviour or problem happens at all | Interviews, session review, support records, event data | Surveys about hypotheticals |
| Prevalence | It happens to this share of this population | Instrumented event data, sampled survey with a defined frame | Request volume, sales anecdote |
| Mechanism | It happens because of this | Interviews, observed sessions, diagnostic instrumentation | Aggregate trend lines |
| Magnitude | It costs this much, or is worth this much | Instrumented outcomes, revenue data, time studies | Stated importance ratings |
| Causation | Changing X changes Y | Controlled experiment, strong quasi-experiment | Before/after comparison |
| Preference | People would choose this | Revealed choice, willingness-to-pay behaviour | Asking people to predict themselves |
Two rules follow. Stated evidence is weak for prediction and strong for mechanism. People are poor at forecasting their own behaviour and good at explaining what they did and why. Behavioural evidence is strong for prevalence and weak for mechanism. Event data tells you how many and when, not why.
Here is the fit gate applied to Noted's response-time signal. Both plans are real work. Only one of them can observe the claim the decision turns on:
Weak — "Add p99, time-to-first-render and a per-endpoint breakdown, then present the reallocation."
Every one of those observes system behaviour, which nobody is disputing. The claim under debate is that users in workspaces over 500 documents are being harmed. Monitoring cannot see harm at any resolution.
Strong — "Existence: review sessions in workspaces over 500 documents for abandoned or repeated actions. Prevalence: count how many paid seats sit in those workspaces."
Two claim types, split apart, each pointed at a method that can observe it. The plan also states what it cannot settle: neither method establishes that the 34% rise is the cause.
Gate 2 — sufficiency. Sufficiency is not a property of the evidence. It is a relation between the evidence and the decision.
| Decision property | Demand more evidence when | Accept less when |
|---|---|---|
| Reversibility | One-way, costly to unwind | Reversible in days |
| Consequence | Large, concentrated, external | Small, internal, diffuse |
| Blast radius | Affects all users or revenue | Affects a bounded slice |
| Cost of the evidence | Cheap and fast to obtain | Slow, expensive, or blocking |
| Option value of waiting | Waiting reveals something | Nothing new arrives by waiting |
The practical test is the flip test: state the level of evidence you plan to collect, then ask whether a result at that level would actually flip your decision. If a result would not flip it, you are collecting evidence to defend a choice you already made. That is a legitimate activity — it is just not research, and it should not be budgeted as research.
Write the flipping result as an observation, not an adjective. "Strong evidence of harm" flips nothing, because nobody can say when it has arrived. "Reviewed sessions in workspaces over 500 documents show abandoned or repeated actions that sessions in smaller workspaces do not" is a result you can either see or not see.
The two gates are independent, so every plan lands in one of four places. Find yours before you staff it — only the top right quadrant is worth funding, and the two on the left cannot be rescued by collecting more:
quadrantChart title Where an evidence plan sits x-axis Method cannot observe the claim --> Method can observe the claim y-axis Decision is already answerable --> Decision needs more certainty quadrant-1 Collect. Fit and need agree quadrant-2 Misfit on a decision that matters. Change the method quadrant-3 Stop and decide. More evidence changes nothing quadrant-4 Fitted evidence you will not use. Spend the time elsewhere
The third thing to write down is what the evidence cannot establish. Every method has a shadow. Naming the shadow before you collect is what keeps a finding from expanding in the retelling.
Boundary
Fit and sufficiency assume that more certainty is purchasable and that the decision waits for it. Sometimes neither is true.
Take Noted's platform dependency, which loses support in ten weeks. No evidence changes the date. Engineering's three-to-five-week estimate has wide uncertainty, and better estimation research would consume the very weeks in question. Here the question is not "what evidence do I need" but "which option stays recoverable if I am wrong". You choose for recoverability, not for certainty.
The same limit applies when the evidence cannot arrive before the decision must be made. A plan that produces the right answer after the deadline is not a better plan than a fast, weak one. It is a worse plan wearing rigour as a costume.
Practice on the Noted decision case
Read the Noted case if you have not already.
Take Signal 3: P95 response time rose 34% for large workspaces.
Large means more than 500 documents — about 4% of workspaces, holding a disproportionate share of paid seats. No support ticket has mentioned speed. The signal came from monitoring. The decision is whether to move engineering time this cycle from planned features to large-workspace response times.
Your task. Build an evidence plan before choosing any method.
- Write the claim that actually needs support. Not "the system is slower" — that is already observed. Write the claim the decision turns on.
- Classify that claim using the table above. Existence, prevalence, mechanism, magnitude, causation, or preference. If it is more than one, split it.
- For each sub-claim, name the method that can observe it, and name one method that would look reasonable and cannot.
- Explain the absence of support tickets. Write two readings: one where the absence is evidence of no harm, one where it is not. State which observation would separate them.
- Set sufficiency. The reallocation is for one cycle; say whether that makes it reversible, and what that does to the bar. Then, given blast radius and the cost of waiting, state the result at which you would commit engineering time.
- Apply the flip test to your own plan, in writing. Name the result that would flip you, as an observation.
- Commit to a position: run the plan, commit now without it, or decline the reallocation. Say which.
Expect to be pushed on: whether your "claim" is really the decision-bearing claim or a restatement of the monitoring number, whether you treated silent tickets as evidence of absence, and whether your sufficiency level is set by the decision or by your own comfort.
Committed to a position? Check it against what a strong answer holds
- Names a decision-bearing claim about users or paid seats, not a restatement of the 34% rise, and splits it into at least two claim types with a different method behind each.
- Says, for each method, what it cannot establish — in particular that nothing in the plan proves the rise is the cause of whatever harm is found.
- Reads the silence in support tickets two ways and names the observation that would separate them. Absence of complaints is treated as something to explain, not as a finding.
- Sets the bar from the decision's properties — one cycle, reversible, bounded to about 4% of workspaces — and states the flipping result as an observation, not a confidence adjective.
- Commits to one of the three positions and says what being wrong costs.
- The most common weak move is stacking more monitoring — p99, per-endpoint, another week — and calling it evidence about harm. It fails the fit gate: monitoring observes the system and cannot see the user at any resolution.
Transfer the move to your product
Take one live decision where you are about to start, or have just started, evidence work.
Answer four questions:
- What is the exact claim this evidence must support, and what type of claim is it?
- Which method can observe that claim type, and what can that method not establish?
- At what level of result would you change your decision? Name the result, not the confidence adjective.
- What is the cost of the delay this evidence introduces, and who bears it?
Answer only from what you hold today. Where you do not know, write <unknown>.
A named gap survives review. A confident guess collapses under it.
Keep one reusable artifact
Evidence plan
Write it for the next person who must make or review the decision. Include the choice, evidence, uncertainty, alternatives, owner, and revision trigger. Link it into your cumulative Product Decision Case.
Produce artifacts/EV-01-evidence-plan.md using the template below.
Write it for the person who will be asked to fund or staff this work — an engineering lead, a design partner, a researcher. That reader needs to see what question is being bought, what it costs, and what result would change the plan.
This extends your Product Decision Case. Your PF-01 decision brief named the choice; this names the evidence that could move it, and the point at which you stop buying more.
artifacts/EV-01-evidence-plan.md# Evidence plan · <short decision name> - **Date:** <YYYY-MM-DD> - **Product:** <product> - **Decision this serves:** <one sentence, from your PF-01 decision brief> - **Requested from:** <who must fund, staff, or unblock this work> ## Claims to be supported (Split any claim that mixes two types. One row per single-type claim.) | # | Claim | Type (existence / prevalence / mechanism / magnitude / causation / preference) | Load-bearing? | |---|---|---|---| | 1 | <claim> | <type> | <yes — the decision turns on it / no> | | 2 | <claim> | <type> | <yes / no> | ## Method fit | Claim # | Method chosen | Why this method can observe this claim type | A method that would look reasonable and cannot | |---|---|---|---| | 1 | <method> | <reason> | <method, and what it would miss> | ## What this evidence cannot establish <Write the shadow of each method before collecting. This is the sentence that stops a finding from growing in the retelling.> - <Method> can show <X>. It cannot show <Y>. ## Sufficiency - **Reversibility of the decision:** <reversible | costly to reverse | one-way> - **Blast radius:** <who is exposed if this is wrong> - **Cost of the evidence:** <time, money, and who is blocked while it runs> - **Option value of waiting:** <what new information arrives if you wait, or none> - **Sufficiency level:** <the specific result strength at which you will commit> ## Flip test - If the result comes back <A>, I will <action>. - If the result comes back <B>, I will <different action>. - If both actions are the same, this plan is not research. State that here and say what the work is really for. ## Ambiguous observations (Facts that have more than one honest reading — silent support tickets, a flat line, an absent segment. Do not resolve them by assumption.) | Observation | Reading 1 | Reading 2 | Observation that would separate them | |---|---|---|---| | <fact> | <reading> | <reading> | <what you would look at> | ## Plan and cost | Step | Method | Who runs it | Elapsed time | Blocks what | |---|---|---|---|---| | 1 | <method> | <person or role> | <days> | <what waits> | ## Position - **Current position:** <run the plan | commit now without it | decline> - **Confidence:** <low | moderate | high> — <why, in one line> - **Strongest reason this plan is wrong:** <the best argument against it> ## Revision trigger <The observation and threshold that would make you stop the plan early, extend it, or abandon the decision it serves. Name the observable and the number.> ## Gaps <Everything marked `<unknown>` above, listed as open questions with who could close them.>
Before you call it done
Six things a reviewer must be able to find. If one is missing, the artifact is not finished — it is a draft with a hole in it.
Before saving, check all six exposures are present. Name any that are missing rather than filling them in yourself:
| Exposure | Present when |
|---|---|
| Choice | The decision this evidence serves is stated as a choice, not a topic |
| Evidence | Every claim has a type, a fitted method, and a written limit |
| Uncertainty | A sufficiency level is set by the decision, not by comfort |
| Alternatives | At least one plausible method is named and rejected with a reason |
| Owner | Who runs each step, and who is blocked while it runs, are both named |
| Revision trigger | A condition that would stop or extend the plan, with a threshold |
Can the reasoning survive these tests?
Answer before you open the explanation. The tutor asks these one at a time and does not show the options’ verdicts until you commit.
01Monitoring shows P95 response time up 34% for large workspaces. The team debates whether users are being harmed enough to justify moving engineering time. A PM proposes adding p99, per-endpoint, and per-region breakdowns. What is wrong with the proposal?
- AThe breakdowns are correct but should be run after the reallocation decision
- BMore monitoring adds precision to a claim about system behaviour, not evidence for a claim about user harm
- CP99 is a poor choice because it is dominated by outliers
- DThe sample of large workspaces is too small at 4% to support any breakdown
Reveal the answer
B. The disputed claim is about harm to users. Monitoring cannot observe it, so more monitoring cannot close the gap. Option D is the tempting answer for a PM who has learned to check sample size: the problem is not that the sample is too small, it is that the method is aimed at the wrong claim.
02You need to know whether enterprise team leads would pay more for automated meeting summaries. Which method fits the claim best?
- AObserved behaviour where a similar capability already carries a price or a real cost to obtain
- BA survey asking team leads to rate how valuable summaries would be
- CCounting how many accounts have requested summaries
- DInterviews asking team leads what they would be willing to pay
Reveal the answer
A. Willingness to pay is a preference claim, and stated preference is weak for prediction. Option D is the answer a competent PM gives after learning to 'talk to users' — but asking people to forecast their own spending measures their self-image, not their behaviour. Request counts (C) measure the sales channel, not prevalence or value.
03No support ticket has ever mentioned slowness in large workspaces. How should this fact enter the evidence plan?
- AAs moderate evidence that the slowdown is not affecting users
- BAs irrelevant, because monitoring is a stronger source than tickets
- CAs an ambiguous observation that needs a second observation to interpret, since silence can mean no harm or no reporting path
- DAs evidence that support triage is failing and should be fixed first
Reveal the answer
C. Absence of a report is not absence of the thing reported. Option A is the natural reading and the dangerous one: it converts a gap in a reporting channel into a finding about users. The fix is to name an observation — for example, whether affected users have ever filed tickets about anything — that separates the two readings.
04A PM plans four weeks of research before a decision that is reversible within a sprint and affects one bounded user slice. The research is well designed and the method fits the claim. What is the strongest objection?
- AFour weeks is too long for any product research
- BReversible decisions should be made by engineering, not by product
- CThe plan should be replaced with an experiment to establish causation
- DSufficiency is set too high for a reversible, low-blast-radius decision, so the evidence costs more than the error it prevents
Reveal the answer
D. Fit and sufficiency are separate gates. This plan passes fit and fails sufficiency. Option C is tempting because experiments feel more rigorous — but a stronger method makes the mismatch worse, not better, by spending even more time on a decision that could be made and unwound cheaply.
05Noted's core dependency loses support in ten weeks. Engineering estimates migration at three to five weeks with wide uncertainty. A PM proposes two weeks of estimation work to narrow the range before deciding how to sequence it. What does the fit-and-sufficiency model say here?
- AThe model does not apply cleanly: the deadline is fixed and the evidence consumes the resource in question, so choose for recoverability instead of certainty
- BSufficiency is high because the consequence is security-related, so the estimation work is justified
- CEstimation is a magnitude claim, so time studies are the correctly fitted method
- DThe decision should be delegated to engineering because it is a technical estimate
Reveal the answer
A. This is the boundary of the model. Buying certainty here spends the same weeks the decision is about, and no result moves the end-of-support date. Option C is the trap for someone who has memorised the claim-type table: the classification is right and still leads to a worse decision, because the cost of the evidence is the constraint.