Delegation readiness

Work is ready to delegate when intent, constraints, interfaces, evidence, and escalation conditions are portable.
25 min1 exercise1 artifact5 checks
Before you start

This lesson builds on PJ-02 Define good, PJ-04 Decision architecture, PJ-05 Decision quality under uncertainty.

01 · The problem

the handover that carried only a topic

Suppose a PM is overloaded. Four signals compete for attention, and the activation decline is the one that keeps slipping. So the PM delegates it: "can you look into the activation drop and come back with what you find?"

Two weeks later a deck arrives. It is competent. It segments activation by platform, shows the decline is broadly distributed, and recommends improving onboarding copy. It answers a question the PM was not asking. The PM redoes the work in three days and concludes, privately, that this is not delegable.

That conclusion is wrong, and it is expensive, because the PM will now hold every consequential investigation personally and will keep being the constraint.

Look at what was actually handed over. A topic. Everything load-bearing stayed in the PM's head: which decision the work serves, which populations matter, which evidence would be sufficient, whether the delegate could talk to the support lead, and what would require coming back early. None of that was missing from the PM's thinking. It was missing from the handover.

The failure is hard to see because the delegate's output is competent. The gap does not look like a communication problem. It looks like a judgment gap in the other person.

Trace what actually crossed between the two people, and what did not:

sequenceDiagram
  participant PM
  participant D as Delegate
  participant S as Support lead
  PM->>D: "Look into the activation drop"
  Note over PM: Decision, populations, evidence bar<br/>and access all stay behind
  D->>D: Segments by platform, writes a deck
  D-->>PM: A competent answer to a question<br/>nobody asked
  PM->>PM: Redoes the work in three days
  Note over D,S: The recordings were never mentioned,<br/>so they were never asked for

One arrow crosses from the PM, and it carries a topic. Everything the delegate needed in order to aim is sitting in the note over the PM's own lane, and the support lead never enters the diagram at all.

Ask before handing anything over: could a competent person who was not in the room produce something I would act on? If not, the gap is in your handover, not in them.

02 · The concept

what must survive leaving your head

Delegation readiness is a portability test. Five things must survive leaving your head.

Element Portable when Symptom when it stays behind
Intent The decision it serves is written, with live alternatives The delegate optimises the task rather than the decision
Constraints Time, budget, population, and what must not change are stated The delegate finds the constraints by violating one
Interfaces Who they can talk to, what they can commit, what they cannot Blocked for a week, or commits something you cannot honour
Evidence standard What counts as sufficient for this decision Anecdotes, or an over-built study nobody needed
Escalation conditions Named observations that require coming back early Escalates everything, or nothing until it is too late

PJ-02 and PJ-04 do most of the work here. The evidence standard is a definition of good applied to the answer rather than to the product. The escalation conditions and the decision rights come straight from your decision architecture. If you have both artifacts, you are most of the way to a delegation contract already. That is the point of writing them.

Delegate the work, or delegate the decision?

These are different, and confusing them is what makes handovers feel arbitrary.

Level What the delegate does What you keep
Execute Produces a defined output to a defined standard The decision, and the framing
Recommend Frames options and argues for one; you decide The decision
Decide Chooses, inside stated boundaries, and informs you The consequence

Say the level out loud, in the handover. Most delegation disappointment is a level mismatch: you thought you asked for a recommendation, they thought they were executing, or they decided something you had not authorised.

Here is the activation handover from the opening of this lesson, and the same handover made portable:

Weak — "Can you look into the activation drop and come back with what you find?"

A topic, a person, and no level. The delegate has to guess the decision, the population, the evidence bar, and whether they are allowed to talk to anyone. Every guess they make is one you will disagree with later.

Strong — "Recommend level, not decide. The decision: change the first-session experience, look outside the first session, or make no product change yet. Sufficient answer: the decline split by acquisition channel and platform for individual knowledge workers, and whether it survives excluding the two changes that shipped in the window. You may ask the support lead for the recordings and engineering for one query. Come back early if the decline concentrates in a single acquisition channel."

The second version is not longer because it is more thorough. It is longer because five things that were in the PM's head are now in the document — level, decision, evidence standard, interfaces, and one escalation condition.

It is still a fragment, not a contract. It has no time box, it does not say whether the inherited activation definition is the delegate's to challenge, and it carries one escalation condition where the Build asks for three. Do not copy it into the Build and call it done.

Accountability does not transfer with the work

You can move all three levels and still own the outcome in your area. This is the same rule as escalation in PJ-04, pointed downward. Delegating is not a way to stop carrying a consequence. It is a way to stop being the only person who can produce the reasoning.

Say this explicitly when you delegate. A delegate who believes they now own the consequence will either over-hedge or over-commit, and both are your doing.

The readiness test

Before handing over, read your own contract as if you had just joined the company. Three questions:

  1. Could you say, in one sentence, what decision this changes?
  2. Could you tell whether you had done enough?
  3. Could you tell when you must come back early?

If any answer is no, the work is not ready. Fix your document, not the person.

Boundary

Not everything should be made portable before it is delegated.

Sometimes the whole point of handing work over is that the other person forms the frame themselves. That is how judgment develops, and it is the only way it develops. If you hand a fully specified contract to someone who is ready to frame the problem, you have given them execution work and told yourself you were growing them.

The dividing line is the one from PJ-04: consequence and reversibility. Delegate the framing when the consequence is small or reversible, and delegate execution with a full contract when it is not. When you deliberately leave the frame open, say so, so the delegate knows the ambiguity is the assignment rather than an oversight.

The same branch decides the level and what stays with you:

flowchart TD
  W["Work you are handing over"] --> C{"Consequence large,<br/>or hard to reverse?"}
  C -->|"no"| F["Delegate the framing<br/>say the ambiguity is the assignment"]
  C -->|"yes"| L{"Which level?"}
  L -->|"execute"| E["Full contract<br/>you keep the decision and the framing"]
  L -->|"recommend"| R["Full contract minus the choice<br/>you keep the decision"]
  L -->|"decide"| DD["Contract plus stated boundaries<br/>you keep the consequence"]

Every path on the right keeps something with you. That is the rule from the section above, drawn: no branch exists where the consequence leaves.

A second limit, stated plainly: a portable contract is not a substitute for competence. Perfect intent, constraints, interfaces, evidence standard, and escalation conditions handed to someone without the required skill produces a well-scoped failure. Portability makes delegation possible. It does not make it safe.

03 · Build it

Practice on the Noted decision case

Read the Noted case if you have not already.

Take Signal 1: activation fell 11% over six weeks.

You have your PJ-02 definition of good for activation. You are not going to run this investigation yourself, because your judgment is committed elsewhere this cycle. Assume you are handing it to one person who is capable, has not been in your meetings, and has access to the product's data.

The relevant facts are in the case: activation is defined as creating a document and returning within seven days, and nobody defends the definition. The decline has not been segmented. Two changes shipped inside the window. Actor identity is missing for about 18% of events. The support lead holds recordings of customer conversations.

Your task. Write a delegation contract that a competent stranger could act on.

  1. State the level: execute, recommend, or decide. Defend the choice against the consequence and reversibility of what follows.
  2. Write the intent as a decision with live alternatives, not as a topic. "Find out why activation dropped" fails this test.
  3. Carry your PJ-02 definition of good across as the evidence standard: what answer would be sufficient, for which population, and what would be more work than this decision justifies.
  4. State the constraints: the time box, and what must not change. Include whether the inherited activation definition is theirs to challenge. That single line changes the whole assignment.
  5. State the interfaces: whether they can speak to the support lead, whether they can ask engineering for a query, and what they may not commit on your behalf.
  6. Write three escalation conditions as observations, not feelings. "If it looks complicated" is not one. "If the decline concentrates in a single acquisition channel" is.
  7. Say who still owns the consequence, in one sentence.
  8. Run the readiness test on your own document. Answer the three questions as if you had just joined.

Expect to be pushed on: whether your intent is a decision or a topic; whether the escalation conditions are observable by the delegate with the access you actually gave them; and whether you said the level out loud or left it to be inferred.

Committed to a position? Check it against what a strong answer holds
  • The level is said out loud — execute, recommend, or decide — and defended from the consequence and reversibility of what follows the answer, not from how busy you are.
  • The intent is the PF-01 decision with its live alternatives. "Find out why activation dropped" fails, and so does any intent that names only one acceptable conclusion.
  • The evidence standard is your PJ-02 definition of good pointed at the answer: which population, which split, what would be sufficient — and an explicit stopping rule for what would be more work than the decision justifies.
  • Constraints include a time box and a one-line ruling on whether the inherited activation definition may be challenged. Interfaces name the support lead and engineering by role, and say what the delegate may not commit on your behalf.
  • The three escalation conditions are things the delegate can actually observe with the access granted — a split that concentrates the decline, a data gap larger than the 18% already known, a shipped change that cannot be isolated — and the consequence stays with you in one sentence, with the readiness test run honestly, including any "no".
  • The most common weak move is handing over a topic with a competent person attached. It is weak because every load-bearing choice then gets guessed, you will disagree with the guesses, and you will conclude the work was not delegable when it was the handover that was not ready.
04 · Use it

Transfer the move to your product

Worksheet · your product

Take one piece of work you are currently holding that someone else could do. Choose one you have privately decided is "not delegable."

Answer five questions:

  1. What decision does this work change, and what are its live alternatives?
  2. What level are you delegating: execute, recommend, or decide?
  3. What counts as a sufficient answer, and what would be more work than the decision justifies?
  4. Who can they talk to, and what may they not commit?
  5. What three observations would require them to come back early?

Write <unknown> where you cannot answer. Every <unknown> here is a reason the work has stayed on your desk, and most of them are yours to close rather than theirs.

05 · Ship it

Keep one reusable artifact

Output · PJ-06

Delegation contract

Write it for the next person who must make or review the decision. Include the choice, evidence, uncertainty, alternatives, owner, and revision trigger. Link it into your cumulative Product Decision Case.

Produce artifacts/PJ-06-delegation-contract.md using the template below.

Write it for someone who was not in any of your meetings. Then read it as that person. The contract is finished when a capable stranger could produce something you would act on without a follow-up conversation.

This closes your Product Judgment phase of the Product Decision Case. It is also the first artifact written for someone other than you, which is the real test of whether the earlier ones carried reasoning or only carried conclusions.

Template · Delegation contractartifacts/PJ-06-delegation-contract.md
# Delegation contract · <short name of the work>

- **Date:** <YYYY-MM-DD>
- **Product:** <product>
- **Delegated to:** <name or role>
- **Delegated by:** <name or role>
- **Level:** <execute | recommend | decide>
- **Owner of the consequence:** <name or role — this does not change by delegating>
- **Due:** <date>

## Intent

**The decision this work changes:**

<One sentence, stated as a choice. "Find out why activation dropped" is a topic
and fails this test.>

**Live alternatives:**

1. <option>
2. <option>

**Why this decision matters now:** <one or two sentences, including what happens if it is not made>

## Level, and why

<Execute, recommend, or decide — and the reason, argued from consequence and
reversibility. If the frame is being left deliberately open so the delegate can
form it, say so here explicitly, so the ambiguity reads as the assignment rather
than an oversight.>

## Evidence standard

- **What a sufficient answer contains:** <the specific claims that must be supported>
- **Population it must cover:** <a behaviour-and-context boundary>
- **What would be more work than this decision justifies:** <name the over-build you are ruling out>
- **What counts as too thin:** <name the under-build you will send back>

## Constraints

| Constraint | Detail |
|---|---|
| **Time box** | <how long, and what happens at the end of it> |
| **What must not change** | <the floors — including anything downstream that depends on this> |
| **Definitions in scope to challenge** | <which inherited definitions they may question, and which are fixed> |
| **Budget or resource** | <what they may spend, in money or in other people's time> |

## Interfaces

| They may | Detail |
|---|---|
| **Talk to** | <named people, and for what> |
| **Request** | <queries, data access, design time — from whom> |
| **Commit** | <what they can agree to on your behalf> |
| **Not commit** | <what they must not agree to, including anything customer-facing> |

## Escalation conditions

Observations, not feelings. Each must be visible to the delegate with the access
listed above.

| # | Observation | What they should do | Who they come to |
|---|---|---|---|
| 1 | <observable> | <pause / flag / bring options> | <name or role> |
| 2 | <observable> | <…> | <…> |
| 3 | <observable> | <…> | <…> |

## Readiness test

Answered as if you had just joined the company and read only this document:

1. **What decision does this work change?** <one sentence>
2. **How would I know I had done enough?** <one sentence>
3. **When must I come back early?** <one sentence>

<If any of the three cannot be answered from the document alone, fix the
document before sending it.>

## Gaps

<Everything marked `<unknown>` above, listed as open questions with who could
close them. Most of these are yours to close, not the delegate's.>
Replace every <angle-bracket> with your own judgment. Where you do not know, write <unknown> and keep it — a named gap is a finding. Never fill a slot with a number you did not measure.

Before you call it done

Six things a reviewer must be able to find. If one is missing, the artifact is not finished — it is a draft with a hole in it.

Before saving, check all six exposures are present. Name any that are missing rather than filling them in yourself:

Exposure Present when
Choice Intent is a decision with live alternatives, and the level is stated rather than inferred
Evidence The evidence standard names what is sufficient, what is over-built, and what is too thin
Uncertainty It is stated which definitions and assumptions are open to challenge and which are fixed
Alternatives The live alternatives are written, so the delegate can argue for one you did not expect
Owner The consequence owner is named, and it is stated that delegating does not move it
Revision trigger Three escalation conditions, each an observation the delegate can actually see
06 · Check understanding

Can the reasoning survive these tests?

Answer before you open the explanation. The tutor asks these one at a time and does not show the options’ verdicts until you commit.

  1. 01A PM hands over "look into the activation drop and come back with what you find." The delegate returns competent work answering a different question. What failed?

    • AThe delegate lacked the judgment to identify the decision behind the request
    • BThe intent was not portable — the decision the work serves, and its alternatives, stayed in the PM's head
    • CThe time box was too short for a proper investigation
    • DThe PM should have reviewed progress at the halfway point
    Reveal the answer

    B. A topic was handed over, not a decision, so the delegate had nothing to optimise against but the task. Option D is the tempting fix a PM reaches for after one bad handover — a mid-point check would have caught the drift, but it treats a missing contract as a monitoring problem and keeps the PM as the constraint.

  2. 02A PM writes a detailed contract for the activation investigation, then adds: "You own this now." What is wrong with that last sentence?

    • ANothing — clear ownership is what makes delegation work
    • BIt should specify which parts they own and which the PM retains
    • CIt conflicts with the escalation conditions, which imply the PM is still involved
    • DAccountability for the outcome does not transfer with the work, and saying it does pushes the delegate to over-hedge or over-commit
    Reveal the answer

    D. Delegation moves the work and sometimes the choice; it never moves the consequence out of your area. Option A is the standard management instinct and it sounds empowering, but a delegate who believes they now carry the consequence will manage their own risk instead of the decision's.

  3. 03An associate PM is ready to grow. The work is a reversible copy experiment on the empty document state. What does the boundary of this lesson recommend?

    • ADelegate the framing, leave the frame deliberately open, and say that the ambiguity is the assignment
    • BWrite a full five-element contract, since consistent contracts build good habits
    • CDelegate at the execute level first, then raise the level once they have delivered
    • DKeep the framing and delegate the analysis, so the learning is contained
    Reveal the answer

    A. Framing is how judgment develops, and low-consequence reversible work is where it is safe to develop it. Option B is the trained answer — a complete contract handed to someone ready to frame the problem converts growth work into execution work while the PM tells themselves they are developing someone.

  4. 04Which of these is usable as an escalation condition in a delegation contract?

    • A"Come back if you feel the investigation is going off track."
    • B"Escalate anything that might affect the enterprise accounts."
    • C"Come back before continuing if the decline concentrates in one acquisition channel."
    • D"Check in with me weekly so we can review progress together."
    Reveal the answer

    C. An escalation condition must be an observation the delegate can actually see with the access you gave them. Option B is the tempting one: it names something consequential, but "might affect" is a judgment call, so the delegate either escalates constantly or waits until it is obvious, which is too late.

  5. 05A PM's contract for the activation work is silent on whether the inherited activation definition can be challenged. Why does that single omission matter so much?

    • AIt leaves the delegate unsure who to ask, which will cost a few days
    • BIt affects whether the analysis is comparable with historical reporting
    • CIt decides whether the assignment is measuring a decline or questioning whether the measure describes the job at all
    • DIt means the evidence standard cannot be applied, since the metric is undefined
    Reveal the answer

    C. Those are two different assignments with different outputs, and the delegate will assume the narrower one. Option D is close and reads well, but the standard can be applied to the inherited definition perfectly well — the problem is that doing so answers a question the PM may not have meant to ask.